A bathroom renovation packs plumbing, electrical, waterproofing, tile, ventilation and storage into one small room, which is why it is one of the easiest projects to get wrong. This bathroom renovation checklist walks through the process in the order it happens, so you know what to decide, what to ask and what to expect before the first tile comes off the wall.
1. Start with why
Before you open a single inspiration board, get clear on what is driving the project.
- Is the room tired and dated, or is something actually broken, like leaks, soft floors or mould?
- Are you renovating for your own comfort, or to improve resale value?
- Who uses this bathroom every day, and what frustrates them most?
Your answers shape every later decision, from budget to layout.
2. Set a realistic budget
- Decide on a total number you are comfortable spending.
- Hold back a contingency for surprises. A CIBC budgeting guide notes that some people suggest 10 percent of the total, and recommends 20 percent or more if you can manage it.
- Older homes can hide problems behind the walls, such as water damage, outdated wiring or old pipes, so a contingency matters most there.
- Rank your priorities. If money gets tight, you want to know whether the heated floor or the custom vanity gets cut first.
- Ask each contractor to break their quote into labour, materials and allowances, so you can compare quotes fairly.
3. Plan the layout
- Measure the room, including ceiling height, door swing and window position.
- Decide whether you are keeping the current layout or moving the toilet, shower or vanity. Moving plumbing fixtures usually costs more than swapping them in place.
- Think about the shower: walk-in, tub and shower combination, or a freestanding tub. Consider who will use it and whether accessibility matters now or later.
- Plan storage early. A recessed niche, a medicine cabinet and a vanity with deep drawers can make a small bathroom feel much bigger.
4. Choose materials and fixtures
Some items can take weeks to arrive, so pick the big ones early.
- Tile for the floor, walls and shower, with a few extra boxes for cuts and future repairs
- Vanity, countertop and sink
- Toilet, faucets and shower fixtures
- Tub or shower base, and a glass enclosure or curtain
- Lighting, mirrors and accessories
- An exhaust fan that vents to the outdoors
A helpful rule: lock in your fixtures before demolition, because the rough-in plumbing depends on exactly which ones you chose.
5. Hire the right contractor
- Get written estimates from at least three contractors for the same scope of work. Ontario's consumer guidance recommends this, and says a home renovation contract worth more than $50 must be in writing.
- Ask what is included, what is an allowance, and what happens if the price changes. The same guidance says the final price cannot be more than 10 percent over the original estimate unless you agree in writing to new work or pricing.
- Keep the deposit small. The guidance recommends no more than 10 percent, and says never to pay the full amount before the work is done.
- Ask for references, including some for similar bathroom projects, and contact them.
- Ask who will actually be on site every day, and what insurance the contractor carries.
- Ask who will do the electrical work. The Electrical Safety Authority says general contractors cannot do electrical work in residences unless they hold an electrical contractor's licence, so confirm the right trade is involved.
- Get the scope, timeline, payment schedule and allowances in writing.
6. Know your permit situation
Whether you need a building permit depends on the work and on your municipality. Permits are issued by municipal building departments that enforce the Ontario Building Code. In Toronto, replacing plumbing fixtures does not need a permit, while installing or modifying plumbing systems, adding or removing walls, and making structural alterations does. Check with your own building department early, and agree with your contractor who is responsible for any permit application.
7. Prepare your home for construction
- Plan where the household will shower and use a toilet during the project.
- Clear the bathroom and the hallway nearby, and protect floors along the path to the room.
- Agree on working hours, parking, and where materials will be stored.
- Expect dust, noise and water shut-offs. A quick heads-up to neighbours is appreciated, especially in condos.
8. What happens during the renovation
A typical order of work looks like this. Your contractor's schedule may differ.
- Protection and demolition
- Inspection of what is behind the walls and under the floor, and any repairs
- Plumbing and electrical rough-in
- Framing changes and subfloor repairs
- Waterproofing
- Tile and flooring
- Vanity, fixtures and glass installation
- Paint, trim and final touches
Ask your contractor for a rough schedule at each stage. Late selections can hold up the work, so keep your decisions flowing.
9. Final walkthrough checklist
Before you make the final payment, walk the room with your contractor and check:
- Every fixture works: sinks, shower, toilet flush, fan and lights
- No leaks under the vanity or around the tub
- Grout and caulking are clean and continuous
- Doors, drawers and glass open and close smoothly
- Walls, trim and paint are free of marks
- You have the paperwork and care instructions, and spare tile
If you are planning a project, our bathroom renovation team can help you work through these decisions before demolition starts.
For the technical readers
This section condenses the technical points behind the checklist. Use it as a guide for questions to ask, not as a replacement for the Code or for the manufacturer's installation instructions.
Waterproofing and slope
In a tiled shower, tile and grout are the finish and the waterproofing membrane under them is the barrier, so the floor beneath the membrane needs slope toward the drain. The Ceramic Tile Education Foundation describes a drop of one quarter inch per foot, built as a sloped fill called a pre-slope under the membrane, and says the tile installer is responsible for providing it if the plumber did not. Ask your contractor who builds the pre-slope, how seams, corners and valve openings are sealed, and how the shower will be tested before tile goes on.
Plumbing and electrical
Ask a licensed plumber to check what is inside your walls while they are open. The City of Toronto notes that lead can be found in water service pipes in homes built before the mid-1950s, in solder used before 1990 and in leaded-brass fixtures. If you plan to move the toilet or shower, ask what that means for the drain, the vent and the floor framing.
In Ontario, the Electrical Safety Authority says electrical work in a home is done by an electrical contractor with the proper licence, with limited exemptions, and that required notifications of the work must be filed with ESA. Ask your electrician which ground-fault protection, wet-location ratings and circuits the Ontario Electrical Safety Code requires for your layout, including for in-floor heating.
Ventilation and moisture
Vent the exhaust fan to the outdoors. Natural Resources Canada recommends bathroom and kitchen exhaust fans that vent to the outside as a minimum, and notes that a bathroom fan alone is not an effective ventilation strategy. Ask your contractor where the duct will end.
Structure, permits and drawings
Ask your contractor to check the joists and subfloor for rot or movement before tile goes down, and whether the tile you chose needs extra support. If the project changes the layout, the plumbing or the structure, ask what drawings your building department will want to see, and keep the approved set with the project.