If your cabinets look tired but are still solid, you may not need a full cabinet replacement. Refacing gives you new doors and drawer fronts on the boxes you already have, while replacement starts completely fresh. Here is how to work out which one your kitchen needs.
Refacing: a fresh face for good cabinets
Refacing is a lovely fit when the cabinet boxes are sturdy, you like where everything sits, and the doors are the part you've grown tired of. You keep the frames, shelves and drawers, and the doors and drawer fronts are swapped for new ones. It's usually the quicker of the two, so the kitchen is out of action for less time. The technical section at the bottom has typical timelines.
Replacement: when you want a real change
Replacing the cabinets makes more sense when the boxes are damaged, or when the kitchen simply doesn't work the way you'd like. If you'd love more storage, a different layout, or a bigger remodel with new countertops and flooring, starting fresh gives you room to do it properly. New doors can't change where the fridge sits or how many drawers you have.
Peek under the sink first
Before you decide, open the cabinet under the sink and the ones beside the dishwasher. These are the most likely places for an old leak to have left swelling, soft spots or mould. If those boxes look damaged, replacement is usually the better choice. If you see widespread mould, have the cause of the moisture found and fixed before any new cabinets go in.
A few questions to ask yourself
- Are the boxes sound, with no sagging, swelling or loose frames?
- Do you want to move the sink, range or fridge, or gain storage?
- Are the countertops and flooring changing too?
- Can the kitchen be out of action for several weeks, or do you need it back quickly?
If you're leaning toward changing the layout, our kitchen layout guide is a good next read. And when you're ready to talk through your own kitchen, the kitchen renovations page shows how to ask for a free estimate.
When you ask for quotes
Whichever way you lean, it helps to ask each company to spell out what's included: the cabinets themselves, the hardware, the countertops and whether old materials are removed. Ask for the schedule in dates rather than a rough range, and ask who will measure and when. Comparing quotes is much easier when every one covers the same list.
The short version
Solid boxes and a layout you love? Refacing is a pleasant, quicker way to refresh the room. Damaged boxes, or a kitchen that never quite works for you? Replacement gives you a fresh start. Either way, it helps to see the boxes for yourself before you decide, and to ask for a clear, dated plan so you know how long the kitchen will be out of action. There's no wrong answer, only the one that suits your home.
For the nerds: the technical details
Everything above is the plain-English version, and it is all you need to make a good decision. Below is the nerdy part: the exact measurements, code and standards references, and sources behind the advice. Read on if you like the details, or skip it with a clear conscience.
What each option changes. A Bob Vila guide (sponsored by a home services company, so read it with that in mind) says refacing keeps the cabinet frames, boxes, shelves and drawers and replaces the doors and drawer fronts, and suits sound boxes and a layout you like. It describes full replacement as removing the old set so the layout and function can change, and notes that scope often grows, for example into new flooring or countertops. Refinishing or painting keeps the existing doors and frames and may not work on every cabinet material, in which case a veneer or new doors is the alternative.
When replacement is better. Angi's reface or replace comparison says refacing does not work on older, damaged cabinets, meaning boxes that are sagging, rotten, mouldy or unstable. It also says refacing cannot fix structural problems, sagging shelves, layout or workflow issues, storage shortfalls, or the inside of the boxes. It gives typical timelines of about three to five days for refacing and about six weeks without a usable kitchen for a full replacement. These are general national figures, and GTA lead times and trade schedules can differ, so ask for a dated plan.
Permits in the GTA. The City of Toronto's building permit page lists installing cabinetry and millwork and repairing or replacing plumbing fixtures among work that does not need a building permit. A permit is needed for structural or material alterations, such as adding or removing walls, and for installing or modifying plumbing systems. Zoning compliance applies even when no permit is needed, and the page says its lists are not exhaustive. Other GTA municipalities and condominium buildings have their own rules, so confirm with your building department and, in a condo, with building management before you order.
Moving things. Moving a sink or other plumbing lines is likely to count as installing or modifying plumbing, which Toronto lists as needing a permit. Electrical work calls for a notification of work to the Electrical Safety Authority (ESA) before the work starts. See the ESA guidance on electrical work.
← Back to all articles